Ongoing Projects

Selected Completed Projects

Projects

DATEM, INC. is a general building Construction Company, envisioned to give its Clients total engineering service in terms of QUALITY, TIME and COST.

The company has the advance technology and construction methodology ideal for medium to high rise building construction.

It has completed the construction of the ABS-CBN Project 9501 Substructure, Superstructure and Precast Panel Works and the Design and Construction of the Substructure, Superstructure, Precast Floor System and Cast-In-place Formworks for the Rockwell "Power Plant" Retail Center Project with Leighton Contractors (Philippines) Inc.

It has also undertaken construction of the Technology Incubator Center Project located at the Fort Bonifacio Institutional Park, Taguig, for Fort Bonifacio Development Corporation; The Forbes Tower Architectural Interior Finishing Works for UCPB Properties, Inc.; the St. Luke’s Diagnostic Center Structural and Architectural Finishing Works for St. Luke’s Medical Center; the substructure works of the One Legaspi Park Project located at Rada St., Legazpi Village, Makati City, the Greenbelt Redevelopment Project located in the Greenbelt Area for Ayala Land, Inc. on a joint venture with Makati Development Corporation, the 3-Storey Warehouse Office Building located in Caloocan City for Phil. Suntal Corporation,the Turf Club Building located in San Lazaro Leisure Park, Carmona, Cavite for Manila Jockey Club, and the Market! Market! Project located in Bonifacio Global City for Ayala Land

DATEM is presently undertaking the construction of the Xanland Place Condominium Project located in Katipunan, Quezon City for AIC Management & Development Corporation, the Eaton Holiday Inn located in Kalayaan Avenue, Makati City for Crown Jewel Corp., the Notre Dame De Vie, House of Solitude and Formation located in Angat, Bulacan for Notre Dame De Vie Institute, the 8 Sto. Domingo Place – Residential Tower B located in Brgy. Sto. Domingo, Quezon City for Fil-Estate Properties, Inc., the Sta. Elena Village Sierra Madre Phase I located in Sta. Rosa, Laguna for Sta. Elena Properties, Inc. and the Trace Computer & Business College located in Los Banos, Laguna for Trace Computer & Business College, and The Columns located in Ayala Avenue, Makati City for Ayala Land, Inc.

DATEM's technology and work methodology involves:

  1. Installation of pre-fixed precast exterior wall façade panels. The panels are 150mm thick 6,000 psi reinforced concrete structural elements with a smooth highly durable quality finish ready to receive paint.
  2. Specialized formworks system for the structural columns, beams, girders, retaining walls and shear walls.
  3. Installation of the precast slab panel system. The precast slab is a 50mm thick slab with cast-in-truss system. Poured off-site using steel molds with a smooth finish requiring no plastering and retouching works.
  4. Installation of precast intermediate beams.

DATEM's Construction Methodology achieves tangible benefits of:

  1. Potential construction time savings on the Structural Works.
  2. Potential services finishing trades construction and commissioning time saving of 1 or more months (dependent upon the effectivity of overall project trades coordination and control).
  3. Earlier handover of structurally complete floors to secondary and finishing trades.
  4. Earlier enclosure of floors which:
    a. Accelerates finishing trade works
    b. Increases safety
    c. Reduces cost time due to inclement weather
  5. High quality finished structural work which eliminates structural rectification and maintenance costs common to conventional construction methods.
  6. Quality controlled manufacturing and erection processes which provide a pleasing visual impact during construction thereby promoting marketing.

It is this VALUE-ADDED Service and Advantage that DATEM can provide.

Our technology tops our resume of unique services that shape the entire breadth of engineering and construction. Complete servicing is key to encourage a one-contract one-contractor arrangement that helps us assure - above all else - quality, safety and faster completion.

Certainly, the future does not solely belong to us - perhaps we're not the only source of building innovation. But while techniques and technology are indeed promising, inevitably it is our accomplished people and tested processes that see and keep these promises. This is evident in the significant improvements we give to a project if we are introduced at an early stage.

Design modifications made to suit our technology very often improves a project's outlook, particularly by facilitating earlier completion. Early completion means immediate operations and earlier return of investments - plenty of savings that to our mind, is made possible by our knowledge and expertise; and our desire to exceed expectations.

Allowing the best of our technology, skills and resources to all come to fore, Datem builds with a rare proficiency shaped and readied for the future. Because the future, with all certainty, belongs to those who are ready for it.

Known for its multi-disciplinary range of construction capabilities, for diversity and leading-edge innovation in the country, Datem combines a portfolio distinguished both in size and in matter: design development for a variety of commercial, residential and civil projects, high-tech construction methods and equipment, as well as a widening docket of Value Engineering studies, and leadership of vast experience - just some of what helps this firm build the bridge to the future.

 


 