Projects
DATEM,
INC. is a general building Construction Company, envisioned
to give its Clients total engineering service in terms of
QUALITY, TIME and COST.
The
company has the advance technology and construction methodology
ideal for medium to high rise building construction.
It
has completed the construction of the ABS-CBN Project 9501
Substructure, Superstructure and Precast Panel Works and the
Design and Construction of the Substructure, Superstructure,
Precast Floor System and Cast-In-place Formworks for the Rockwell
"Power Plant" Retail Center Project with Leighton
Contractors (Philippines) Inc.
It
has also undertaken construction of the Technology Incubator Center Project
located at the Fort Bonifacio Institutional Park, Taguig, for Fort Bonifacio
Development Corporation; The Forbes Tower Architectural Interior Finishing Works
for UCPB Properties, Inc.; the St. Luke’s Diagnostic Center Structural and
Architectural Finishing Works for St. Luke’s Medical Center;
the substructure works of the One Legaspi Park Project located at Rada St.,
Legazpi Village, Makati City, the Greenbelt Redevelopment Project located in
the Greenbelt Area for Ayala Land, Inc. on a joint venture with Makati Development
Corporation, the 3-Storey Warehouse Office Building located in Caloocan City
for Phil. Suntal Corporation,the Turf Club Building located in San Lazaro Leisure Park,
Carmona, Cavite for Manila Jockey Club, and the Market! Market! Project located in
Bonifacio Global City for Ayala Land
DATEM
is presently undertaking the construction of the Xanland Place Condominium Project
located in Katipunan, Quezon City for AIC Management & Development Corporation,
the Eaton Holiday Inn located in Kalayaan Avenue, Makati City for Crown Jewel Corp.,
the Notre Dame De Vie, House of Solitude and Formation located in Angat, Bulacan
for Notre Dame De Vie Institute, the 8 Sto. Domingo Place – Residential Tower B
located in Brgy. Sto. Domingo, Quezon City for Fil-Estate Properties, Inc.,
the Sta. Elena Village Sierra Madre Phase I located in Sta. Rosa, Laguna
for Sta. Elena Properties, Inc. and the Trace Computer & Business College
located in Los Banos, Laguna for Trace Computer & Business College, and
The Columns located in Ayala Avenue, Makati City for Ayala Land, Inc.
DATEM's
technology and work methodology involves:
-
Installation
of pre-fixed precast exterior wall façade panels.
The panels are 150mm thick 6,000 psi reinforced concrete
structural elements with a smooth highly durable quality
finish ready to receive paint.
-
Specialized formworks system for the structural columns,
beams, girders, retaining walls and shear walls.
-
Installation of the precast slab panel system. The precast
slab is a 50mm thick slab with cast-in-truss system. Poured
off-site using steel molds with a smooth finish requiring
no plastering and retouching works.
-
Installation of precast intermediate beams.
DATEM's
Construction Methodology achieves tangible benefits of:
-
Potential
construction time savings on the Structural Works.
-
Potential
services finishing trades construction and commissioning
time saving of 1 or more months (dependent upon the effectivity
of overall project trades coordination and control).
-
Earlier
handover of structurally complete floors to secondary
and finishing trades.
-
Earlier
enclosure of floors which:
a. Accelerates finishing trade works
b. Increases safety
c. Reduces cost time due to inclement weather
-
High
quality finished structural work which eliminates structural
rectification and maintenance costs common to conventional
construction methods.
-
Quality
controlled manufacturing and erection processes which
provide a pleasing visual impact during construction thereby
promoting marketing.
It
is this VALUE-ADDED Service and Advantage that DATEM can provide.
Our
technology tops our resume of unique services that shape the
entire breadth of engineering and construction. Complete servicing
is key to encourage a one-contract one-contractor arrangement
that helps us assure - above all else - quality, safety and
faster completion.
Certainly,
the future does not solely belong to us - perhaps we're not
the only source of building innovation. But while techniques
and technology are indeed promising, inevitably it is our
accomplished people and tested processes that see and keep
these promises. This is evident in the significant improvements
we give to a project if we are introduced at an early stage.
Design
modifications made to suit our technology very often improves
a project's outlook, particularly by facilitating earlier
completion. Early completion means immediate operations and
earlier return of investments - plenty of savings that to
our mind, is made possible by our knowledge and expertise;
and our desire to exceed expectations.
Allowing
the best of our technology, skills and resources to all come
to fore, Datem builds with a rare proficiency shaped and readied
for the future. Because the future, with all certainty, belongs
to those who are ready for it.
Known
for its multi-disciplinary range of construction capabilities,
for diversity and leading-edge innovation in the country,
Datem combines a portfolio distinguished both in size and
in matter: design development for a variety of commercial,
residential and civil projects, high-tech construction methods
and equipment, as well as a widening docket of Value Engineering
studies, and leadership of vast experience - just some of
what helps this firm build the bridge to the future.
|